| Proposed Infrastructure | 5000 |
|---|---|
| Infrastructure Cost¹ | 5000 |
| Meter and Cabling (Low-Tension) Cost | 5000 |
| Linking Cost | 5000 |
| Installation / Store Handling / Design Vetting Charges | 5000 |
| PMT Sharing / Rehabilitation Charges | 5000 |
| Total Cost ⁴ | 5000 |
| Security Deposit | 5000 |