Proposed Infrastructure | 5000 |
---|---|
Infrastructure Cost¹ | 5000 |
Meter and Cabling (Low-Tension) Cost | 5000 |
Linking Cost | 5000 |
Installation / Store Handling / Design Vetting Charges | 5000 |
PMT Sharing / Rehabilitation Charges | 5000 |
Total Cost ⁴ | 5000 |
Security Deposit | 5000 |